Two quotes 30% apart aren't automatically suspicious. London and the South East routinely cost 20–40% more than the North East for the same job. A Victorian terrace with awkward access costs more than a new-build.
Use our calculator to see the typical low–high range for your job in your region, then expect quotes to land somewhere inside (or close to) that band.
If a quote is well above the high end, ask why. If it's well below, ask what's not included — cheap quotes often skip materials, disposal, or making good.
