Can a tradesperson increase an accepted quotation?
The difference between a quotation and an estimate does most of the work here — and so does what the contract says about variations.
Last reviewed 10 August 2026First published 10 August 2026Written by the TradesChecker editorial team
The short answer
Once you accept a fixed-price quotation, that price is generally the agreed price, and it does not change simply because the job proved harder or materials became dearer. It can change where you both agree a variation, or where the contract itself allows for it. An estimate is a different thing: it is an indication, and it is expected to move.
Quotation or estimate?
A quotation is an offer of a specific price for specific work. Accept it and you generally have a contract at that price. An estimate is a considered guess, and both sides understand the final figure may differ.
The label on the document is not conclusive — what matters is what was actually agreed between you. This is why it helps enormously to have the word 'fixed price' or 'estimate' written down at the outset, along with what it covers.
Where increases can be legitimate
- You changed your mind: different tiles, an extra socket, moving a soil pipe. That is a variation, and it is fair to pay for it.
- Genuinely hidden conditions revealed once work opens up — rot beneath a floor, no lintel above an opening, unsafe existing wiring.
- A clearly worded clause in the contract allowing for specified increases, which you agreed to.
- Provisional sums and allowances, which were never fixed prices in the first place and are adjusted against actual cost.
Where an increase looks weaker
- The contractor under-measured or mis-priced the job as specified.
- General supplier price rises during a short job on a fixed-price contract.
- Work the contractor could have foreseen from a proper site visit.
- An increase presented only at the end, with no notice at the time it arose.
What to do when a price rises mid-job
Ask for the increase in writing before the extra work is carried out, with a description of what has changed, why, and the additional cost. Approve variations one at a time in writing, even by text message.
If the extra work is genuinely necessary but the price seems high, you can ask for the breakdown, or price the additional element separately in our calculators before agreeing.
Where a service contract does not fix a price in advance, the Consumer Rights Act 2015 requires the consumer to pay a reasonable price. What is reasonable depends on the circumstances, so if you cannot agree, take free independent advice rather than assuming either position is settled.
Questions you can put to the tradesperson
- “Is this a fixed-price quotation, or an estimate that may change?”
- “Will you put any variation in writing, with the cost, before carrying it out?”
- “What in this price is a provisional sum rather than a fixed figure?”
These are ordinary questions. A contractor who is comfortable with their pricing will answer them without difficulty.
Put this into practice
Cost calculators
Build an indicative cost range for your own job and specification before you judge any quotation.
Open cost calculatorsCheck My Quote
Enter the quotation you have received and see whether it sits within or outside the expected range, and what may be missing from it.
Open check my quoteCompare quotations
Put two or three quotations side by side on scope, VAT, materials, waste, access and payment terms rather than on the headline total.
Open compare quotationsSources
Checked on 10 August 2026. Rules, thresholds and scheme requirements change, so follow the link for the current position.
- Consumer Rights Act 2015, Part 1 Chapter 4 (services)legislation.gov.uk
- Consumer advice, including the consumer helplineCitizens Advice
- Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013legislation.gov.uk
General information, not advice on your own circumstances, and not a legal opinion. For help with a specific dispute, contact Citizens Advice or another free independent service.
Related guides
What should I do if additional work is discovered?
Opening up a roof or a floor genuinely does reveal surprises. A calm, written process keeps a legitimate variation from becoming a dispute.
What should an itemised quotation contain?
A checklist of everything a written quotation should set out, from scope and VAT treatment to exclusions, access and the payment schedule.
How should staged payments work?
Payments tied to completed stages, with a final balance held back until the job is genuinely finished and the paperwork is in.
Check a quotation against the expected range
Enter the quotation you have received and see whether it sits within or outside the expected range, and which items may be missing from it.
What you can expect from us
TradesChecker is an independent UK service. We help you understand a job, sense-check its likely cost and examine a quotation — we do not carry out the work and we do not sell your findings.
- Built for UK customers
- Prices, VAT treatment, certification and regional differences are all based on how work is priced in the United Kingdom.
- Estimates are indicative
- Our figures are a guide to help you plan and ask better questions. They are not a quotation, a survey or a valuation.
- Regional and job factors matter
- Specification, access, location, materials, VAT and site conditions all move real prices — sometimes well outside a typical range for good reason.
- Findings are not for sale
- Commercial relationships never influence what we report about a quotation. No one can pay to change a finding.
Our assessments are informational and do not replace professional surveying, estimating, building-control or legal advice. How we source our data.