The short answer
Everything needed to know exactly what you are buying, at what price, on what terms — and, just as importantly, what is not included. A single line reading 'bathroom refit — £9,500' is a price, not a quotation.
The trader and the contract
- The trading name, a geographic address and contact details, and the company registration number if it is a limited company.
- A clear statement of whether the figure is a fixed-price quotation or an estimate that may change.
- How long the price stays open, and the terms and conditions that apply.
- Where you agreed the contract at home rather than at business premises, the information and cancellation rights required by the Consumer Contracts Regulations 2013, which generally include a 14-day cancellation period.
The work itself
- A description of the scope in enough detail that a different contractor could price the same job from it.
- Labour: what is being done, and ideally the number of trades and days allowed.
- Materials: specification, make or range where it matters (tiles, boiler model, roof covering, block type), and quantities.
- Preparation and making good — chasing, plastering, decoration — and who is responsible for it.
- Waste: who removes it, whether a skip or licensed waste carrier is included, and where it will stand.
- Access: scaffolding, towers, parking permits, and any suspension of parking bays.
Money and timing
- The total price and whether VAT is included, excluded, or not charged. If VAT is not shown at all, ask directly rather than assuming.
- Any deposit, what it is for, and when the balance falls due.
- A staged payment schedule tied to identifiable stages of work rather than to dates alone.
- Provisional sums and prime cost allowances, clearly labelled as allowances rather than fixed prices.
- Expected start date and duration, and what happens if the programme slips.
Compliance, certificates and cover
- Which certificates you will receive on completion and who issues them.
- Whether building control notification is required, and who arranges it.
- Public liability insurance, and any guarantee or warranty with its length and who stands behind it.
Exclusions are as valuable as inclusions
A quotation with a short, honest exclusions list is usually a better document than one with none. Exclusions let you compare like with like and stop disagreements later. If nothing is excluded, ask what happens if the contractor lifts the floor and finds rotten joists — the answer should already be in the quotation.
Questions you can put to the tradesperson
- “Is VAT included in this figure?”
- “What have you assumed about access, waste and making good?”
- “Which parts of this are fixed and which are allowances?”
These are ordinary questions. A contractor who is comfortable with their pricing will answer them without difficulty.
Put this into practice
Check My Quote
Enter the quotation you have received and see whether it sits within or outside the expected range, and what may be missing from it.
Open check my quoteCompare quotations
Put two or three quotations side by side on scope, VAT, materials, waste, access and payment terms rather than on the headline total.
Open compare quotationsCost calculators
Build an indicative cost range for your own job and specification before you judge any quotation.
Open cost calculatorsSources
Checked on 10 August 2026. Rules, thresholds and scheme requirements change, so follow the link for the current position.
- Consumer Rights Act 2015, Part 1 Chapter 4 (services)legislation.gov.uk
- Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013legislation.gov.uk
- Invoicing and taking payment from customersGOV.UK
- Consumer advice, including the consumer helplineCitizens Advice
General information, not advice on your own circumstances, and not a legal opinion. For help with a specific dispute, contact Citizens Advice or another free independent service.
Related guides
How can I compare differently itemised quotations?
Three quotations, three different layouts, three different totals. A method for normalising them so you are comparing the same job.
How should staged payments work?
Payments tied to completed stages, with a final balance held back until the job is genuinely finished and the paperwork is in.
What certificates should I receive?
Gas, electrical, glazing and building control paperwork by job type — what it is called, who issues it, and why you will want it when you sell.
Check a quotation against the expected range
Enter the quotation you have received and see whether it sits within or outside the expected range, and which items may be missing from it.
What you can expect from us
TradesChecker is an independent UK service. We help you understand a job, sense-check its likely cost and examine a quotation — we do not carry out the work and we do not sell your findings.
- Built for UK customers
- Prices, VAT treatment, certification and regional differences are all based on how work is priced in the United Kingdom.
- Estimates are indicative
- Our figures are a guide to help you plan and ask better questions. They are not a quotation, a survey or a valuation.
- Regional and job factors matter
- Specification, access, location, materials, VAT and site conditions all move real prices — sometimes well outside a typical range for good reason.
- Findings are not for sale
- Commercial relationships never influence what we report about a quotation. No one can pay to change a finding.
Our assessments are informational and do not replace professional surveying, estimating, building-control or legal advice. How we source our data.