    The short answer

    It depends on the work. Gas work should produce a Gas Safe record and, for a new appliance installation, a Building Regulations compliance certificate. Notifiable electrical work should produce an installation certificate and building control notification. Replacement windows and many building works need building control sign-off or a competent person scheme certificate.

    Gas work

    Anyone carrying out gas work in your home must be on the Gas Safe Register, and you can check their registration and the categories of work they are qualified for directly with the Register. Ask to see the ID card and check the back.

    For a boiler or other appliance installation, the engineer should notify the work and you should receive a Building Regulations compliance certificate as well as the installation paperwork. A landlord's gas safety record is a different document, produced for a safety check rather than an installation.

    Electrical work

    Electrical installation work in dwellings is covered by Part P of the Building Regulations. Some work is notifiable to building control; the scope is set out in Approved Document P.

    Depending on the work, you should receive an Electrical Installation Certificate or a Minor Electrical Installation Works Certificate, issued against BS 7671. Where the electrician is registered with a competent person scheme, they can self-certify and arrange the building control notification, and you should receive that notification too. If you are having a property checked rather than altered, the document is an Electrical Installation Condition Report.

    Windows, doors and glazing

    Replacement windows and external doors are generally subject to building regulations. Installers registered with a competent person scheme such as FENSA or CERTASS can self-certify and register the installation, and you should receive that certificate. Otherwise the work needs building control involvement.

    Building work more generally

    • Structural alterations, extensions, loft conversions and many roofing and drainage works need building regulations approval, with a completion certificate at the end.
    • Solid fuel and wood-burning appliances are typically certificated through a competent person scheme such as HETAS, or through building control.
    • Insulation, heat pumps and solar installations under government schemes commonly carry MCS certification and TrustMark registration — check what your particular scheme requires.
    • Manufacturer warranties for boilers, roofs and windows are usually conditional on registration by the installer, so ask for the registration confirmation, not just the leaflet.

    If the paperwork never arrives

    Ask in writing, giving a clear date. Certificates are routinely issued weeks after completion, so start with a polite reminder.

    If it still does not come, the scheme operator or register concerned is the next step — Gas Safe Register, the electrician's competent person scheme, FENSA, or your local authority building control for work notified to them.

    Missing certificates tend to surface at the worst moment: when a buyer's solicitor asks for them. Chasing now is far easier than an indemnity policy later.

    Questions you can put to the tradesperson

    • “Which certificates will I receive, and who issues them?”
    • “Is this work notifiable to building control, and are you arranging that?”
    • “Will you register the manufacturer's warranty, and can I have the confirmation?”

    These are ordinary questions. A contractor who is comfortable with their pricing will answer them without difficulty.

    Put this into practice

    Check My Quote

    Enter the quotation you have received and see whether it sits within or outside the expected range, and what may be missing from it.

    Open check my quote

    Cost calculators

    Build an indicative cost range for your own job and specification before you judge any quotation.

    Open cost calculators

    Compare quotations

    Put two or three quotations side by side on scope, VAT, materials, waste, access and payment terms rather than on the headline total.

    Open compare quotations

    Sources

    Checked on 10 August 2026. Rules, thresholds and scheme requirements change, so follow the link for the current position.

    General information, not advice on your own circumstances, and not a legal opinion. For help with a specific dispute, contact Citizens Advice or another free independent service.

    All help and protection guides

    Enter the quotation you have received and see whether it sits within or outside the expected range, and which items may be missing from it.

    What you can expect from us

    TradesChecker is an independent UK service. We help you understand a job, sense-check its likely cost and examine a quotation — we do not carry out the work and we do not sell your findings.

    Built for UK customers
    Prices, VAT treatment, certification and regional differences are all based on how work is priced in the United Kingdom.
    Estimates are indicative
    Our figures are a guide to help you plan and ask better questions. They are not a quotation, a survey or a valuation.
    Regional and job factors matter
    Specification, access, location, materials, VAT and site conditions all move real prices — sometimes well outside a typical range for good reason.
    Findings are not for sale
    Commercial relationships never influence what we report about a quotation. No one can pay to change a finding.

    Our assessments are informational and do not replace professional surveying, estimating, building-control or legal advice. How we source our data.