Plastering is one of the trades where prices vary wildly for what is, on paper, the same job. A skim coat on a 4x4m room can be quoted at £350 by one plasterer and £750 by another — and the higher quote isn't always the better job.
This guide pulls together typical 2026 UK plastering prices, what's reasonable to expect for the money, and the line items that quietly push quotes higher than they need to be.
Compare your quote against typical UK regional prices — free, no sign-up.
How UK plasterers price work
Most UK plasterers price by the room or by the day. A typical day rate in 2026 sits between £200 and £350, with London and the South East at the top of that range. A skilled plasterer will skim one to two rooms a day, depending on size.
Per-room pricing is more common for skim coats; full re-plasters (where old plaster is hacked off and re-bonded) are usually quoted by the m² or as a fixed price for the whole job.
Skim vs full re-plaster
A skim coat is a 2–3mm finishing layer over existing sound plaster or new plasterboard — the cheap, fast option. A full re-plaster involves removing damaged plaster down to the brick, applying a bonding undercoat, and finishing with skim. It typically costs 2.5–3.5x a simple skim.
Many quotes blur the line. If you're being charged full re-plaster prices, you should see scratch coat, bonding and skim listed separately — not a single 'plastering' line.
What the price should include
Materials (multi-finish plaster, bonding agent, scrim tape, beads), tools, dust sheets, basic prep and tidy-up should all be included. Skirting removal/refit, hacking off old plaster and waste removal are usually extras — but they should be itemised before you sign.
Beware vague 'making good' lines. They're often where padding hides.
Real UK price examples
Typical 2026 ranges based on submitted quotes and regional pricing data.
Key takeaways
- A simple skim is £380–£700 a room. Full re-plaster is 2.5–3.5x that.
- Day rates run £200–£350 — anything over £350 needs justifying.
- Insist on itemised lines: hack-off, bonding, skim, beads, waste — not one bundled figure.
- Allow 3–7 days drying before painting. A trade pushing for same-day paint isn't doing you a favour.
- Ask to see previous skim work — finish quality is what you're really paying for.
Frequently asked questions
Doing some of the prep or finishing yourself? Browse tools and materials at Tooled Up.
Affiliate link
Check your quote against UK pricing data
Get a fair-price range for your job in 30 seconds. Free, independent, no sign-up.
Related guides
More honest UK pricing guides you might find useful.

Volatile material prices, fake bookings, fuel costs and brutal cash-flow pressure are pushing UK trades from 'pay on completion' to upfront deposits. Here's what's really driving it — and what's reasonable.

Real 2026 UK prices for full roof replacements — concrete tile, clay tile and slate — plus the scaffolding, felt and battening costs that swing the final bill.

Real 2026 UK prices for air source heat pump installs — unit, hot water cylinder, radiator upgrades and the BUS grant — plus what 'heat pump ready' actually means.

Real 2026 UK prices for converting a single or double garage into living space — insulation, floor build-up, windows and the building regs work that's not optional.
