How many quotations should I obtain?
Three written quotations for the same written specification is the practical standard. Here is why, and when two or four makes more sense.
Last reviewed 10 August 2026First published 10 August 2026Written by the TradesChecker editorial team
The short answer
Three is the usual working number for any job of real value. The number matters far less than whether every quotation prices the same written specification — three quotations for three different jobs tell you almost nothing.
Why three is the common answer
One quotation gives you a price with nothing to test it against. Two gives you a difference but no way of knowing which is the outlier. Three usually reveals a pattern: either two cluster and one sits apart, or all three sit within a band, which tells you the market rate for your job in your area is roughly that band.
There is no rule of law requiring three quotations. It is simply the smallest number that lets you tell a genuine market range from a single unusual price.
The specification matters more than the count
The most common reason quotations look wildly different is that they are not pricing the same job. One includes scaffolding, another assumes ladder access. One includes making good and decoration, another stops at bare plaster. One includes waste removal, another leaves a skip for you to arrange.
Write down what you want once — materials, finishes, what is being removed, who disposes of waste, who makes good — and give the same document to everyone. Ask each contractor to price that document and to list clearly anything they have excluded.
When three is not the right number
- Emergencies. If water is coming through a ceiling, get the leak stopped safely and treat the repair as a separate, quoted job afterwards.
- Very small jobs. Chasing three quotations for a two-hour job wastes everyone's time, including yours.
- Highly specialised work — listed buildings, structural alterations, unusual roof coverings. You may only find two contractors who genuinely do that work, and a competent two beats a padded three.
- Large projects. For a full extension or conversion, four or five is reasonable, because the sums involved justify the extra effort.
Be straightforward with the people quoting
Tell contractors that you are obtaining other quotations. It is entirely normal and most will expect it. What is not fair is using one contractor's detailed breakdown as a free specification for a cheaper firm to undercut — that is how good contractors stop quoting for domestic work.
Give everyone the same deadline, and tell people who were not successful. It costs nothing and it is remembered.
Questions you can put to the tradesperson
- “Is this quotation based on the specification I sent you, and have you excluded anything from it?”
- “Is this a fixed-price quotation or an estimate that may change?”
- “How long does this price remain open for acceptance?”
These are ordinary questions. A contractor who is comfortable with their pricing will answer them without difficulty.
Put this into practice
Cost calculators
Build an indicative cost range for your own job and specification before you judge any quotation.
Open cost calculatorsCompare quotations
Put two or three quotations side by side on scope, VAT, materials, waste, access and payment terms rather than on the headline total.
Open compare quotationsCheck My Quote
Enter the quotation you have received and see whether it sits within or outside the expected range, and what may be missing from it.
Open check my quoteSources
Checked on 10 August 2026. Rules, thresholds and scheme requirements change, so follow the link for the current position.
- Consumer Rights Act 2015, Part 1 Chapter 4 (services)legislation.gov.uk
- Consumer advice, including the consumer helplineCitizens Advice
- TrustMark — the government-endorsed quality schemeTrustMark
General information, not advice on your own circumstances, and not a legal opinion. For help with a specific dispute, contact Citizens Advice or another free independent service.
Related guides
What should an itemised quotation contain?
A checklist of everything a written quotation should set out, from scope and VAT treatment to exclusions, access and the payment schedule.
How can I compare differently itemised quotations?
Three quotations, three different layouts, three different totals. A method for normalising them so you are comparing the same job.
Can a tradesperson increase an accepted quotation?
The difference between a quotation and an estimate does most of the work here — and so does what the contract says about variations.
Check a quotation against the expected range
Enter the quotation you have received and see whether it sits within or outside the expected range, and which items may be missing from it.
What you can expect from us
TradesChecker is an independent UK service. We help you understand a job, sense-check its likely cost and examine a quotation — we do not carry out the work and we do not sell your findings.
- Built for UK customers
- Prices, VAT treatment, certification and regional differences are all based on how work is priced in the United Kingdom.
- Estimates are indicative
- Our figures are a guide to help you plan and ask better questions. They are not a quotation, a survey or a valuation.
- Regional and job factors matter
- Specification, access, location, materials, VAT and site conditions all move real prices — sometimes well outside a typical range for good reason.
- Findings are not for sale
- Commercial relationships never influence what we report about a quotation. No one can pay to change a finding.
Our assessments are informational and do not replace professional surveying, estimating, building-control or legal advice. How we source our data.